Fuse box, 60 A or 100 A service, breakers that trip, or a new EV charger on the way? Most Etobicoke homes move to a 200 A Eaton panel for $3,900 to $4,800 plus HST. Not sure what you have? Send a photo of your panel and we will tell you.
Panel upgrade by Energo Electric in Etobicoke, done under ESA permit.New breaker panel installed by Energo Electric.
Your panel is the heart of your home’s electrical system. An old fuse box, a 60 A or 100 A panel, or a Federal Pioneer Stab-Lok, Federal Pacific or Zinsco panel may not handle air conditioning, an EV charger, a heat pump or a renovation. We replace it with a new 200 A Eaton panel, handle the ESA permit and inspection, and arrange the utility disconnect and reconnect for you.
Live in The Kingsway? See our Kingsway electrician page for panel upgrades, generators and EV chargers in your neighbourhood.
A fuse box, Stab-Lok, Federal Pacific, Zinsco or Pushmatic panel
Planning an EV charger, heat pump, hot tub or addition
Your insurer asked for an upgrade
Burning smell or discoloured breakers
Have a Federal Pioneer Stab-Lok panel? Some home insurers ask about or require replacing them. Check with your broker. We give you a written assessment, and the ESA certificate after the work. Read our Stab-Lok guide.
What’s included in a panel upgrade?
New 200 A Eaton breaker panel
Meter base upgrade when the utility requires it
Every circuit labelled and balanced
ESA permit and inspection
Removal of the old panel
Full cleanup and a walkthrough when we’re done
How much does a panel upgrade cost in Etobicoke?
Prices are plus HST, with the final price confirmed after a free look at your panel.
100 A to 200 A, overhead service: $3,900 to $4,800
60 A fuse box to 200 A: priced from your photos
Underground or mast service: priced from your photos
Whole-home surge protector with its matching breaker: add-on, quoted with your panel
Utility fees: Toronto Hydro charges for the disconnect, and the owner pays it. Alectra, Hydro One and Elexicon usually do one free isolation every 12 months.
Photos from our recent panel jobs
Real photos from Energo Electric panel jobs this fall: an old crowded panel before replacement, a new panel mounted with its main breaker, each circuit moved onto a new breaker, and the finished panel with the cover on and labelled.
Before the panel upgrade: an old electrical panel with crowded wiring.Step 1 of the panel upgrade: the new breaker panel is mounted with the main breaker in place.Step 2: each circuit is connected into the new breaker panel.After the electrical panel upgrade: every circuit on a new breaker, with neat wiring.Finished breaker panel with the cover on and the Energo Electric label.
Panel upgrade questions
How much does a panel upgrade cost in Etobicoke?
Most Etobicoke homes move to a new 200 A Eaton panel for $3,900 to $4,800 plus HST. That covers the panel, breakers, ESA permit and inspection. A new service cable or a hydro disconnect can add cost, and we confirm any extra in writing before work starts. Send a photo of your panel and we give you one all-in price.
What is an electrical service upgrade?
A service upgrade increases the power coming into your home, for example from 100 A to 200 A, and includes the new panel. Homeowners do it for an EV charger, a heat pump, air conditioning or a renovation. We do service upgrades in Etobicoke under an ESA permit and we work with the hydro company on the disconnect.
Should I replace an old electrical panel?
Age alone is not the rule, but old fuse boxes and Federal Pioneer Stab-Lok, Federal Pacific and Zinsco panels often cannot handle modern loads, and some insurance companies ask for them to be replaced. A licensed electrician should look at it. Send us a photo of your panel and we will tell you what you have.
How long does a panel upgrade take?
Most panel upgrades take one day. Your power is off for most of that day, and we tell you the date in advance so you can plan around it.
What brand do you install?
We install Eaton panels and breakers. That is the brand in every panel upgrade we quote, and it comes with the manufacturer’s warranty.
Do you deal with the hydro company?
Yes, we deal with the hydro company for you. We book the disconnect and reconnect with Toronto Hydro or your local utility. Toronto Hydro charges a disconnect fee, which the owner pays.
How soon is the ESA inspection?
The ESA inspection is usually within a few business days. We book it for you, and you get the ESA certificate by email for your insurance.
Is there a warranty?
Yes, you get a 2-year workmanship warranty. That is on top of the manufacturer’s warranty on the panel and breakers.
Electrical service upgrade and 200 amp panel questions
How much does it cost to upgrade to 200 amp service in Toronto?
For most homes, an electrical panel upgrade to a new 200 amp Eaton panel is $3,900 to $4,800 plus HST, including the ESA permit and inspection. A full 200 amp service upgrade in Toronto can also need a new service cable, a new meter base and the Toronto Hydro disconnect fee. We confirm those parts in writing before work starts, so you see one price.
Can I upgrade my electrical panel from 100 amp to 200 amp?
Yes. A 100 amp to 200 amp upgrade replaces the panel and, where needed, the service cable and meter base, so the house can draw more power. Toronto Hydro has to approve the service upgrade and disconnect the power for the day, and the work needs an ESA permit and inspection. We send the request to Toronto Hydro, file the permit and book the inspection.
Is an electrical service upgrade to 200 amps worth it?
It is worth it when a load calculation shows your 100 amp service is full. That is common once a home adds an EV charger, a heat pump, air conditioning or a second unit. If the calculation shows room, you do not need a service upgrade, and we will tell you so. A new panel on the same service, or an EV load manager, can cost less.
Do you replace fuse boxes and Federal Pioneer Stab-Lok panels?
Yes. Fuse box replacement and Federal Pioneer Stab-Lok panel replacement are done the same way as any panel upgrade: the old panel comes out, a new Eaton breaker panel goes in, and the work is ESA permitted and inspected. Some insurers ask for this before they renew. Read our guide on Federal Pioneer Stab-Lok panels.
How to check your own electrical panel
How do I know if my electrical panel is 100 or 200 amps?
Look at the main breaker, the largest switch in the panel, usually at the top. The number on its handle, such as 60, 100, 125 or 200, is the size of your service in amps. A fuse box with no main breaker is usually 60 amps. If the number is worn off, text a photo of the open panel to (416) 938-0322 and we will tell you what you have.
How do I know if my electrical panel is overloaded?
The usual signs are breakers that trip when two large appliances run at once, lights that dim when the air conditioner starts, and a panel with no empty spaces left. The sure test is a load calculation under the Ontario Electrical Safety Code, which adds up what the house uses and compares it with the size of the service. We do that calculation before we recommend an upgrade. Our guide on 100 amp or 200 amp panels explains the difference.
Are fuse boxes still legal in Ontario?
Yes. The Electrical Safety Authority (ESA) says the Ontario Electrical Safety Code is not retroactive, so a fuse panel that was installed properly can stay. The risks are practical. Most fuse panels are only 60 amps, and ESA lists putting a 20 or 30 amp fuse where a 15 amp fuse belongs as an unsafe practice. Some insurers ask for breakers before they renew a policy, so ask yours.
What customers say
Had my old fuse panel upgraded to a full breaker panel. Jean Carlo was quick, professional, and clearly knew exactly what he was doing.
Energo Electric crew wiring a multi unit meter service.
Matthew S.
Just had my service panel upgraded. Jean Carlos was very professional, knowledgeable and gave a very fair estimate.
Louis D.
A panel upgrade is also the time to plan for pot lights or a standby generator, because both need room in the panel.