Panel Upgrades in Etobicoke
Fuse box, 60 A or 100 A service, breakers that trip, or a new EV charger on the way? Most Etobicoke homes move to a 200 A Eaton panel for $3,900 to $4,800 plus HST. Not sure what you have? Send a photo of your panel and we will tell you.

Your panel is the heart of your home’s electrical system. An old fuse box, a 60 A or 100 A panel, or a Federal Pioneer Stab-Lok, Federal Pacific or Zinsco panel may not handle air conditioning, an EV charger, a heat pump or a renovation. We replace it with a new 200 A Eaton panel, handle the ESA permit and inspection, and arrange the utility disconnect and reconnect for you.
Live in The Kingsway? See our Kingsway electrician page for panel upgrades, generators and EV chargers in your neighbourhood.
How do I know if I need a panel upgrade?
- Lights that dim when appliances run
- Breakers that trip or fuses that blow
- A fuse box, Stab-Lok, Federal Pacific, Zinsco or Pushmatic panel
- Planning an EV charger, heat pump, hot tub or addition
- Your insurer asked for an upgrade
- Burning smell or discoloured breakers
Have a Federal Pioneer Stab-Lok panel? Some home insurers ask about or require replacing them. Check with your broker. We give you a written assessment, and the ESA certificate after the work. Read our Stab-Lok guide.
What’s included in a panel upgrade?
- New 200 A Eaton breaker panel
- Meter base upgrade when the utility requires it
- Every circuit labelled and balanced
- ESA permit and inspection
- Removal of the old panel
- Full cleanup and a walkthrough when we’re done
How much does a panel upgrade cost in Etobicoke?
Prices are plus HST, with the final price confirmed after a free look at your panel.
- 100 A to 200 A, overhead service: $3,900 to $4,800
- 60 A fuse box to 200 A: priced from your photos
- Underground or mast service: priced from your photos
- Whole-home surge protector with its matching breaker: add-on, quoted with your panel
- Utility fees: Toronto Hydro charges for the disconnect, and the owner pays it. Alectra, Hydro One and Elexicon usually do one free isolation every 12 months.
Panel upgrade questions
How long does a panel upgrade take?
Most panel upgrades take one day. Your power is off for most of that day, and we tell you the date in advance so you can plan around it.
What brand do you install?
We install Eaton panels and breakers. That is the brand in every panel upgrade we quote, and it comes with the manufacturer’s warranty.
Do you deal with the hydro company?
Yes, we deal with the hydro company for you. We book the disconnect and reconnect with Toronto Hydro or your local utility. Toronto Hydro charges a disconnect fee, which the owner pays.
How soon is the ESA inspection?
The ESA inspection is usually within a few business days. We book it for you, and you get the ESA certificate by email for your insurance.
Is there a warranty?
Yes, you get a 2-year workmanship warranty. That is on top of the manufacturer’s warranty on the panel and breakers.
What customers say
Had my old fuse panel upgraded to a full breaker panel. Jean Carlo was quick, professional, and clearly knew exactly what he was doing.
Matthew S.
Just had my service panel upgraded. Jean Carlos was very professional, knowledgeable and gave a very fair estimate.
Louis D.
Related services
EV charger installation · Aluminum and knob-and-tube repair · Guide: Federal Pioneer Stab-Lok panels
ECRA/ESA Licensed Electrical Contractor #7017134. Every job permitted and inspected. Call (416) 938-0322 or email contact@energoelectric.ca.
